| LNG export terminals | Export schedules slip when a terminal's control system or power is down, but China was already a negligible LNG buyer. | 0-3 months | Wave 1 (direct) | eia.gov LNG exports and China series |
| Crude and NGPL export docks | Ethane and propane cargoes to China stop; Netherlands, South Korea, Canada, and Taiwan crude cargoes can still load. | 0-3 months | Wave 1 (direct) | eia.gov China rates and crude destinations |
| Interstate product pipelines | A multi-day shutdown stops gasoline and diesel from reaching East Coast terminals. | 0-3 months | Wave 1 (direct) | energy.gov Colonial incident |
| Petroleum refineries | A control-system outage cuts fuel output that the domestic market still needs. | 0-3 months | Wave 1 (direct) | eia.gov refinery capacity |
| Wholesale fuel terminals | Terminal racks are the handoff from pipeline or ship to truck. | 0-3 months | Wave 1 (direct) | energy.gov Colonial incident |
| Marine carriers | Voyages lengthen when a loading port or destination terminal will not take the ship. | 0-6 months | Wave 1 (indirect) | eia.gov NGPL and LNG SPA notes |
| Fuel trucking | Trucks cannot lift product if the rack or the pipeline behind it is down. | 0-3 months | Wave 1 (indirect) | energy.gov Colonial incident |
| Convenience fuel retailers | Stations run dry when the rack stops, and a ransomware event can close the point of sale. | 0-3 months | Wave 3 (direct) | convenience.org store count |
| Trading and scheduling systems | Nominations and invoices stop even when the physical plant is intact. | 0-6 months | Wave 2 (direct) | eia.gov China liquids and SPA terms |
| Oilfield service firms | Work stops when crews cannot reach wells or cannot get paid. | 1-12 months | Wave 3 (direct) | eia.gov NGPL exports; Commerce OCTG initiation |
| Trade finance and marine insurance | Lenders and hull underwriters reprice cargoes that no longer have a Chinese discharge port. | 0-6 months | Wave 2 (direct) | eia.gov China liquids and crude destinations |