Australia runs two rail systems that a China stop does not hit the same way. Export bulk rail loses Chinese demand. Interstate intermodal is a domestic general-freight system. Trainline 13 says explicit rail traffic data is not available for the Pilbara iron ore network, and that published iron ore export volumes through the ports are the proxy because the iron ore is generally moved to the ports by rail. In 2024-25, Port Hedland exported 569.8 million tonnes and Dampier exported 147.1 million tonnes. Those are port tonnes, not a weighbridge on the Pilbara railway, and they are not interstate intermodal.
bitre.gov.au
China's share of the iron-ore loss is a trade table, not a rail table. In calendar 2024, Australia exported 899,747,000,000 kilograms of non-agglomerated iron ores and concentrates. China took 767,150,000,000 kilograms. That is a calculated 85.3 percent. The heading is HS 260111 only. The year is calendar 2024, not the 2024-25 port year. The share is not multiplied by Port Hedland tonnes.
wits.worldbank.org
Coal is a partial China exposure. In calendar 2024, Australia exported 361,958,000,000 kilograms of HS 2701 coal. China took 83,987,300,000 kilograms, a calculated 23.2 percent. Japan's quantity was 110,374,000,000 kilograms, larger than China's. A China stop takes the China slice. It does not empty the Hunter Valley or the Central Queensland Coal Network.
wits.worldbank.org
Interstate intermodal is a different denominator. In October 2025 there were 118 scheduled intermodal services per week on capital-city pairs, a reduction of 19 from February 2024. Paths are paid allocations and may differ from trains run. ARTC gross tonnes include empty wagons and locomotive weights, and coal on the interstate network is excluded. Acacia Ridge-Casino intermodal was 5.12 million gross tonnes in 2024-25. Aurizon interstate containerised freight was 205,745 TEU in 2024-25. None of those figures is a Pilbara tonne.
bitre.gov.au
The short operating analog is one month of punctuality, not a year-over-year peak. Between July 2023 and June 2025, approximately 53.5 percent of North-South intermodal trains exited the ARTC network within 30 minutes of schedule. Reliability was lowest in January 2024, at approximately 40 percent, and highest in May 2025, at approximately 68.5 percent. The East-West ARTC component averaged approximately 57.3 percent, with a low in March 2025 at approximately 34.5 percent.
bitre.gov.au
The equipment channel is imports of locomotive and rolling-stock parts. In 2024, Australia imported HS 8607 worth 205,534.21 thousand US dollars. China was 86,404.59 thousand US dollars, a calculated 42.0 percent. The partner table does not name Taiwan. Trainline 13 does not name China or Taiwan as an equipment origin.
wits.worldbank.orgbitre.gov.au
The cyber baseline is the ACSC critical-infrastructure fact sheet for 2024-25, not a named railroad breach. ASD's ACSC responded to over 1,200 incidents. Transport, postal and warehousing was 26 percent of critical-infrastructure incidents. The guidance says operators should be able to isolate vital operational technology and enabling systems for 3 months. That sentence is guidance. It is not an observed Australian rail outage.
cyber.gov.au
A China stop hits iron ore first. The calculated 85.3 percent quantity share uses 767,150,000,000 kilograms divided by 899,747,000,000 kilograms of HS 260111. Japan took 49,986,300,000 kilograms and Korea 48,481,400,000 kilograms. Other Asia, nes took 12,504,900,000 kilograms. Other Asia, nes is not Taiwan. The table has no row named Taiwan.
wits.worldbank.org
The Pilbara physical proxy in 2024-25 is Port Hedland at 569.8 million tonnes, up 0.8 percent from 565.2, and Dampier at 147.1 million tonnes, up 1.5 percent from 144.9. The export total of 734.3 million tonnes also includes Esperance at 3.8 million tonnes and Geraldton at 13.6 million tonnes. Esperance and Geraldton are not the Pilbara heavy-haul system. Aurizon's Yilgarn contract hauls up to 4.4 million tonnes a year from Koolyanobbing to Esperance. Karara ore travels by rail to Geraldton. Those are separate railways from the Pilbara owners.
bitre.gov.au
Coal export ports in 2024-25 were Newcastle 146.20 million tonnes, Hay Point 96.17, Gladstone 64.29, Abbot Point 34.03, and Brisbane 4.96, a total of 345.65 million tonnes, down 0.74 percent from the previous year. Port Kembla was not available. These are port tonnes. They are not Aurizon above-rail tonnes and they are not an interstate gross tonne.
bitre.gov.au
The China coal slice is the calculated 23.2 percent of HS 2701 quantity. China's value was 8,278,433.47 thousand US dollars. India's value was larger, at 8,772,249.71 thousand US dollars, on a smaller quantity of 41,811,900,000 kilograms. Korea was 32,124,100,000 kilograms. Japan remains the largest quantity and the largest value. Continuing buyers are those named rows. Other Asia, nes at 26,910,400,000 kilograms is not Taiwan, and the coal table does not name Taiwan.
wits.worldbank.org
Aurizon's own coal book is a third series. In 2024-25 Aurizon above-rail coal was 192.2 million tonnes, of which the Central Queensland Coal Network was 133.7 million tonnes and New South Wales plus southeast Queensland was 58.5 million tonnes. Hunter Valley and Illawarra inside that New South Wales book were 53.4 million tonnes. Below-rail tonnes hauled by all operators on the Aurizon-managed Central Queensland Coal Network were 208.0 million tonnes. Hunter Valley and Illawarra at 53.4 million tonnes is one operator's above-rail figure. It is not Newcastle's 146.20 million tonnes and it is not the whole Hunter railway.
bitre.gov.au
The freight chapter of the Australian Infrastructure and Transport Statistics Yearbook 2025 says the domestic freight task reached its highest point in 2024-25 at 786 billion tonne kilometres, and that rail transported approximately 447 billion tonne kilometres of freight while road accounted for approximately 253 billion tonne kilometres. The same page says the highest volume domestic freight route is iron ore transported by rail in the Pilbara region, and that the next largest individual flow is coal carried by rail in Central Queensland and the Hunter Valley. Those are national task and route descriptions. They are not a China share, and they are not multiplied by the calculated 85.3 percent.
bitre.gov.au
Aurizon's FY2026 results presentation prints company volumes beside the FY2025 figures that Trainline also carries. Coal total volumes were 192.0 million tonnes in FY2026 beside 192.2 million tonnes in FY2025. Network total volumes were 212.5 million tonnes in FY2026 beside 208.0 million tonnes in FY2025, and the page prints 2 percent. Containerised freight total volumes were 236,866 TEU in FY2026 beside 205,745 TEU in FY2025, and the page prints 15 percent. The footnote on the containerised row says the series does not include Queensland hook-and-pull services or a Bulk mineral sands contract hauled by National Interstate. Coal contracted volume for FY2027 stands at 211 million tonnes, a reduction of 20 million tonnes compared with the prior year. Those prints are company volumes and a company contract. They are not a war forecast and not a China share of the tonnes. Explicit Pilbara rail tonnes stay unpublished.
media.aurizon.com.aubitre.gov.au
Interstate intermodal does not carry the Pilbara task. Gross tonnes on the ARTC and Arc Infrastructure interstate networks include empty wagons and locomotives, weight freight by the share of the segment travelled, and exclude coal. Intermodal-designated tonnes are capital-city to capital-city trains, including regional or export traffic attached en route. Some Pacific National and SCT Logistics intermodal-designated trains also carry steel. Acacia Ridge-Casino intermodal was 5.12 million gross tonnes in 2024-25, against 5.35 in 2023-24, with non-intermodal on that combined segment at 0.06 and the segment total at 5.18.
bitre.gov.au
A dispatch outage is the path that stops the domestic interstate train even though that train has no Chinese buyer. The ACSC fact sheet says state-sponsored actors use living-off-the-land techniques, and that access to a critical-infrastructure network could degrade confidence, disrupt availability, or cause destructive effects. Transport, postal and warehousing accounted for 26 percent of critical-infrastructure incidents, behind financial and insurance services at 32 percent. The fact sheet does not assign those incidents to rail. No named Australian railroad outage was on the pages opened. The measured railroad incident that was opened is an alleged DDoS in October 2022 on one of Danish operator DSB's ICT service providers, which disrupted DSB operations for several hours by affecting access to a key safety-critical IT system. Railway Gazette says 21 incidents targeting the railway sector were analysed, out of a total of 98 cyber attacks, for January 2021 to October 2022. The exploitability limit is an alleged supplier DDoS of several hours, not remote brake-command injection.
cyber.gov.aurailwaygazette.com