| Data halls | A DCIM compromise can disrupt monitoring across NEXTDC's operating halls even while the grid feed is still up. | 0-3 months | Wave 1 (direct) | CISA EcoStruxure advisory; NEXTDC FY26 report |
| Campus power interconnection | New halls wait on a transmission-connection list whose gigawatts are applications, while operating data-centre demand is a few hundred megawatts in New South Wales and Victoria. | 0-3 months | Wave 1 (indirect) | AEMO Quarterly Energy Dynamics September quarter |
| UPS and backup generation | An internet-exposed UPS management interface can drop the backup path inside an Australian hall when the feeder fails. | 0-3 months | Wave 1 (direct) | CISA UPS insight; NEXTDC FY26 report |
| Cooling plant | A remote flaw in cooling and power monitors can force a thermal shutdown, and the imported cooling equipment has no published country split. | 0-3 months | Wave 1 (direct) | CISA Liebert advisory; DFAT goods factsheet; Macquarie presentation |
| Server and accelerator fleet | Replacement servers are an imported computers line with no partner split, and the accelerator inside a certified AI factory still depends on Taiwan wafers and a named assembly list that includes China. | 1-6 months | Wave 2 (direct) | DFAT goods factsheet; NVIDIA fiscal 2026 10-K; NEXTDC FY26 report |
| Hall network | The network inside the hall is the path a remote DCIM or UPS flaw uses, and it is the connectivity an operator is told to document before an isolation. | 0-3 months | Wave 1 (direct) | ACSC operational-technology note; CISA UPS insight |
| Submarine cable landings | International traffic for Sydney and Melbourne halls depends on submarine cables, and only three protection zones are declared around two Sydney approaches and Perth. | 0-6 months | Wave 1 (indirect) | ACMA Sydney zones page; ACMA protection-zone guide; NEXTDC FY26 report |
| Colocation tenants | Tenant workloads already billing stop when the hall loses cooling, UPS, or the in-hall network, separate from any cloud subscription. | 0-6 months | Wave 2 (indirect) | NEXTDC FY26 report; CISA EcoStruxure advisory |
| Fit-out counterparties | Electrical and mechanical contractors carry a multi-year build against imported heating, cooling, and circuit equipment whose origins are unpublished. | 1-12 months | Wave 3 (indirect) | NEXTDC FY26 report; DFAT goods factsheet |
| Small hosting establishments | The small operating tranche on the pages opened is a 6 MW first phase, and an establishment census was not published, so a direct controller hit is sized in megawatts. | 1-12 months | Wave 3 (direct) | Macquarie presentation; CISA UPS insight |